clean energy

Access to clean energy at the lowest cost at a fixed price for a nominal term of 25-years

Clean energy

Cheap energy

Prices are up to 50% lower than other energy providers.

Cheap energy

Own a share of a virtual power plant.

Energy generation, storage and distribution assets and resources (DER) and all equipment and facilities required to generate and deliver the desired quantity of energy.

Chart

we've got your back.

We provides members with everything they need to generate and store their own energy.

We provide members with additional and customised
support.

We provides members with everything they need to generate and store their own energy.

We provide members with additional and customised support.

Learn More

coin

A-deus means smart saving

with a-deus you save

£12405

per year, compared to
other prividers

Our most basic plan provide

A-SAVER 10
  • Energy savings of up to 50%
  • Fixed annual prices for 25 years
  • Customisable energy plans
  • 24/7 Service and Customer Support
  • VIVAIN Energy Concerige (info icon with more information)
Learn More About Membership Plans

set-up is easy

The member connection process commences as soon as an energy plan is selected, and members should be fully connected to the A-DEUS energy network within 30 days. Assuming a membership candidate with no existing smart meter, the key engagement during the 30 days is outlined below:

1. Immediately after signup, members will be sent an invite to select a date and time for a virtual meeting to design a connection plan including a date for smart meter installation.

2. Prior to the agreed installation date, a credit check is run on the candidate for membership to determine if the selected energy plan could be sustainable afforded by the candidate.

3. On the agreed date the A-DEUS network boxes including smarts meters and other monitoring and supervisory systems will be installed by a team of three to five A-DEUS engineers, this will be done without replacing or moving the existing meters (gas and / or electric) at the property.

4. 24 hours after the installation is complete, the new member will be sent notice of Power On and the existing supplier would be informed of the switch over.